International sales & technical solutions for NeoCat technologyWhatsApp +45 28 89 13 81 · sales@neocat.tech
NeoCat Technology – FORS2020 ApS globe logo
Danish technology · Operated from Denmark by FORS2020 ApS

Passive NeoCat units for ice arenas, ventilation, kitchens and wastewater

NeoCat Technology brings NeoCat, developed by Biogram in Denmark, to commercial and public-sector customers in Denmark, the European Union and other international markets.

Each NeoCat unit is a sealed stainless-steel unit that works without a power supply and needs no routine maintenance of its own. Every project is sized to the site and followed up with the site's own records.

Featured application · Ice hockey arenas

Ice hockey arenas: where energy matters most

Ice arenas run refrigeration, ventilation and dehumidification for long hours, so electricity is a major operating cost. NeoCat has been installed at an ice hockey arena in Denmark, and the arena's electricity consumption before and after installation has been measured.

Electricity consumption at the arena, before and after installation: April–June 2025 98,725 kWh and April–June 2026 63,397 kWh (35,328 kWh lower); July–September 2025 234,748 kWh and July–September 2026 214,169 kWh (20,579 kWh lower). Across the two quarters, consumption was 55,907 kWh lower. These are results from one installation; they are not a guarantee for other sites.

Every arena project starts with a review of the site's own consumption data, so the result can be measured on that site.

ICE ARENA
  • Placed in non-freezing parts of the ventilation system
  • No power supply and no routine maintenance at the unit
  • Before-and-after review based on the arena's own meter data
Example of a NeoCat Air unit mounted in ventilation equipment (Roskilde Congress & Sports Centre – not the ice arena).
Example of a NeoCat Air unit mounted in ventilation equipment (Roskilde Congress & Sports Centre – not the ice arena).
Product one-pagers

DOWNLOAD OUR PRODUCT ONE-PAGERS

One-page product summaries in English (PDF). Download directly – no registration or email address required.

✓ Sealed stainless-steel unit
✓ No power supply at the unit
✓ No routine maintenance of the unit itself
✓ Minimum five years guaranteed operation
The NeoCat unit

One sealed unit. No wiring, no running power, no routine service.

NeoCat is fitted into the system where it is needed – an air-handling unit, an extractor hood, a grease trap or a sump – and then stays in place. There is nothing to plug in and nothing to programme.

Because the unit has no power supply, it adds no electricity load of its own and can be retrofitted into existing systems. The number and position of units are selected for each system, following the manufacturer's installation instructions.

  • Retrofits into existing ventilation, hood, grease-trap and sump systems
  • No power supply or cabling at the unit
  • No routine maintenance of the unit itself
  • Minimum five years guaranteed operation under normal operating conditions – warranty terms set out in each quotation
  • Correct installation is essential for the result

Three application areas

NeoCat Air III

Ice arenas & ventilation

For ventilation and air-handling systems in ice arenas, sports halls, conference venues and other large buildings.

Learn more →
NeoCat Fat III

Commercial kitchen exhaust

For extractor hoods and kitchen exhaust ducts in hotels, restaurants, hospitals, catering.

Learn more →
NeoCat Fat III

Grease traps & wastewater

For grease traps, sumps and drains with recurring grease deposits and odour – a supplement to required grease separation and emptying.

Learn more →
Evidence before slogans

We build projects around measurable outcomes

We agree the objective and record a baseline before installation, so the result can be judged on the site's own data – not on general promises.

01

Define

Agree the problem and the objective – for example energy use, grease deposits, cleaning intervals or odour.

02

Baseline

Record meter data, photos, temperatures, cleaning or emptying records before installation.

03

Install

Size and position NeoCat for the specific system, following the manufacturer's instructions.

04

Review

Compare like-for-like records after installation and report what was measured.

Why NeoCat

Passive technology, practical installation

NeoCat units are housed in stainless steel and fitted directly into the system where they are needed – without an electrical connection to the unit.

01

Site review

We review the system, the problem as the site sees it and the records that already exist.

02

Correct sizing

The number and placement of units are selected for the specific system – not sold as one-size-fits-all.

03

Follow-up

Where possible, we review comparable before-and-after records together with the site.

Installation references

Installed in demanding Danish buildings

According to Biogram's case material, NeoCat units are installed at the sites below. Select a reference to open it. These are installation references and customer observations – not documented effect measurements. Measured energy results are shown only for the ice hockey arena.

Start with your site

Tell us what you need to solve

Send photos, system drawings, energy or meter data, or current cleaning records. We will review the application and suggest the next technical step.

Contact

Talk to our team

✆